Pictures of Primero Building Project: Watch Us Grow!

Throughout the building project, we will post pictures on this site periodically.

The Color Scheme for the Building Project:

Upper LH Corner: Wall Colors for Office and Entrance Area and office countertop laminates

Upper RH Corner: Wall colors for art-music-industrial arts wing

Lower LH Corner: Floor tiles and molding for lobby and hallways in 1962 portion of building

Lower RH Corner: Floor tiles for art-music-industrial arts wing

Middle: countertop laminates for computer lab

Carpet sample: carpeting in offices and library

Designed by Tammy Dorsey, Interior Designer, The Neenan Company

Asbestos Abatement, March 21 - 27, 2008 (over spring break)

Hallway before ceiling and floor tiles were abated

Hallway after ceiling and floor were abated

Preparing the computer lab for abatement

Hallway looking towards office before abatement

Hallway looking towards office after floor and ceiling were abated

Containment and air flow system for abatement

Asbestos abatement airlock

Worker abating asbestos floor tiles in computer lab

Asbestos containment system

Drilling Rig, Modular Relocate, Electrical Installation and Storage

Drilling rig for forty 400' wells for the groundsource heat pump system; dirt piles in foreground are donated by Sam Lopez for the baseball outfield (March 2008). Drilling work by CanAmerica Corp., subcontracted by Ennovate under the Neenan Company.

New location of modular building on southwest corner of football field. Will be used as a temporary office March - September 2008 and a temporary industrial arts classroom September - December 2008. Final use will be for athletic storage and half-time football meetings. (March 2008)

Trench for electrical supply lines dug by Forest Management 3/08. Electrical installed by Bret's Electric. Phone line installed by FreCom. Supply lines for modular building and concession stand.

Neenan's storage box by the parking lot 4/08

Primero's two storage boxes by the bus barn 4/08

Completed well field for ground source geothermal heat pump system 4-30-08

San Isabel Removes Electrical Poles in Advance of Major Summer Construction Work

Preparing to remove electrical poles by old industrial arts building 5-8-08

San Isabel Electric Association prepares to remove electrical poles 5-8-08

Hydraulic lifts on SIEA trucks remove poles

Poles jacked for removal

Jacking the poles for removal

Old bus barn (industrial arts and storage) cleaned out in advance of demolition 5-8-08

Boiler Room, Irrigation Well Repair, Track Stake Layout, Sprinkler-Irrigation System Work at Track Site, Baseball Outfield Progress

Repair work on 1964 irrigation well 5-6-08 by Webber Well Service

Repaired 1964 wellhead. Restored to 40 gpm + flow rate!

Larger view of repaired 1964 wellhead 5-20-08

Geothermal connection lines 5-20-08

Geothermal lines 5-20-08

Old boiler was removed weekend of 5-16 to 5-18-08

Geothermal connections 5-20-08

 

 

Stakes for marking out new all-weather track 5/08

Trench for sprinker system work at football field/track 5/08

Sprinkler-irrigation system work by Water Works Plus 5/08 at the football field and track site

Trench work for sprinkler/irrigation system at football field and track by Water Works Plus 5-6-08

Another view of the trench work 5/08

Earthwork for sprinkler-irrigation system 5-08

 

Second view of backhoe at work by football field-track site

Neenan Construction Office trailer, placed in loading dock May 5, 2008

Old septic tank removed during well field work 5-08

Bulldozer smooths earth piles into new baseball outfield 5-08

The baseball outfield is prepared 5-08

Old Industrial Arts Bulding Demolition 5-15-08

Removal of Radiators for Old Hot Water System, Storage, Signs, Structural Reinforcement for Windows, Track Prep.

Hoist to lift metal reinforcements to install over windows in 1962 original building

Installing metal beams over windows 5-20-08

Another view of metal beam installation

Removing old hoter water radiators in cafeteria 5-20-08

Preparing to demo radiator in cafeteria

Wall in room 14 with radiators removed

Another view of radiators removed in room 14 and floor tile abatement area for

Construction signs installed 5-18-08

New ventilation pipes installed 5-16 to 5-18-08 in Arguello Gym

Painting modular building 5-29-08

Track preparations 5-29-08

Track grading 5-29-08