Pictures of Primero Building Project: Watch Us Grow!
Throughout the building project, we will post pictures on this site periodically.
|
The Color Scheme for the Building Project:
Asbestos Abatement, March 21 - 27, 2008 (over spring break) |
||||||||||
|
Hallway before ceiling and floor tiles were abated |
Hallway after ceiling and floor were abated |
Preparing the computer lab for abatement |
||||||||
|
Hallway looking towards office before abatement |
Hallway looking towards office after floor and ceiling were abated |
Containment and air flow system for abatement |
||||||||
|
Asbestos abatement airlock |
Worker abating asbestos floor tiles in computer lab |
Asbestos containment system |
||||||||
Drilling Rig, Modular Relocate, Electrical Installation and Storage
|
Drilling rig for forty 400' wells for the groundsource heat pump system; dirt piles in foreground are donated by Sam Lopez for the baseball outfield (March 2008). Drilling work by CanAmerica Corp., subcontracted by Ennovate under the Neenan Company. |
New location of modular building on southwest corner of football field. Will be used as a temporary office March - September 2008 and a temporary industrial arts classroom September - December 2008. Final use will be for athletic storage and half-time football meetings. (March 2008) |
Trench for electrical supply lines dug by Forest Management 3/08. Electrical installed by Bret's Electric. Phone line installed by FreCom. Supply lines for modular building and concession stand. |
|
Neenan's storage box by the parking lot 4/08 |
Primero's two storage boxes by the bus barn 4/08 |
Completed well field for ground source geothermal heat pump system 4-30-08 |
|
San Isabel Removes Electrical Poles in Advance of Major Summer Construction Work |
||
|
Preparing to remove electrical poles by old industrial arts building 5-8-08 |
San Isabel Electric Association prepares to remove electrical poles 5-8-08 |
Hydraulic lifts on SIEA trucks remove poles |
|
Poles jacked for removal |
Jacking the poles for removal |
Old bus barn (industrial arts and storage) cleaned out in advance of demolition 5-8-08 |
|
Boiler Room, Irrigation Well Repair, Track Stake Layout, Sprinkler-Irrigation System Work at Track Site, Baseball Outfield Progress |
||
|
Repair work on 1964 irrigation well 5-6-08 by Webber Well Service |
Repaired 1964 wellhead. Restored to 40 gpm + flow rate! |
Larger view of repaired 1964 wellhead 5-20-08 |
|
Geothermal connection lines 5-20-08 |
Geothermal lines 5-20-08 |
Old boiler was removed weekend of 5-16 to 5-18-08 |
|
Geothermal connections 5-20-08
|
Stakes for marking out new all-weather track 5/08 |
Trench for sprinker system work at football field/track 5/08 |
|
Sprinkler-irrigation system work by Water Works Plus 5/08 at the football field and track site |
Trench work for sprinkler/irrigation system at football field and track by Water Works Plus 5-6-08 |
Another view of the trench work 5/08 |
|
Earthwork for sprinkler-irrigation system 5-08
|
Second view of backhoe at work by football field-track site |
Neenan Construction Office trailer, placed in loading dock May 5, 2008 |
|
Old septic tank removed during well field work 5-08 |
Bulldozer smooths earth piles into new baseball outfield 5-08 |
The baseball outfield is prepared 5-08 |
|
Old Industrial Arts Bulding Demolition 5-15-08 |
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Removal of Radiators for Old Hot Water System, Storage, Signs, Structural Reinforcement for Windows, Track Prep. |
||
|
Hoist to lift metal reinforcements to install over windows in 1962 original building |
Installing metal beams over windows 5-20-08 |
Another view of metal beam installation |
|
Removing old hoter water radiators in cafeteria 5-20-08 |
Preparing to demo radiator in cafeteria |
Wall in room 14 with radiators removed |
|
Another view of radiators removed in room 14 and floor tile abatement area for |
Construction signs installed 5-18-08 |
New ventilation pipes installed 5-16 to 5-18-08 in Arguello Gym |
|
Painting modular building 5-29-08 |
Track preparations 5-29-08 |
Track grading 5-29-08 |